Showing posts with label negotiations. Show all posts
Showing posts with label negotiations. Show all posts

29 October 2010

On the First Month of the Occupation: The Bare Minimum is a place with...

The Negotiator playing poker. The gas fireplace behind.



Heat. Heat is a Bare Essential when the temperature begins to drop in autumn, especially in the North. Nothing is more disheartening and lonely than an empty house without heat.

With humidity's retreat, the stagnant, sulfuric atmosphere that had encouraged low-tide summer walks and late night back-porch talks lifted overnight, carrying out to sea the idleness of summer. The clean air transformed late nights of conversation into brief evenings of hunker-down discussions. The crickets and cicadas lull was replaced by the urgent calls of migrating birds. Mr Cool's evening cigarette break on the stoop became brief, interrupted by unpleasant breezes. Somehow, without our noticing, autumn arrived, the sudden cool, a reminder of the rafter-shaking Nor'easters out gaining strength somewhere over the Atlantic.

And we had no heat.

Let me clarify. We had sources of heat but no way to power them. Unlike a wood fireplace or a wood burning stove that, when installed and vented properly, requires no skill beyond the early Cromagnun to ignite, a direct-vent gas fireplace comes with a thirty page manual of diagrams and text.

During the first two weeks in the house, we kept looking at the manual too late in the evening when the diagrams looked like extraterrestrial hieroglyphs and the accompanying text seemed too simple to explain the diagrams.

But it turns out, all we needed was a thermostat, and no one had bothered to install one.

Around that time we also discovered that the ducting for the furnace had not been redirected into the Instigator's bedroom when the dormer was added. And the thermostat for the oil furnace had not been replaced and instead hung off the wall by a thin wire like a decapitated android head dangling over the kitchen island.

I called the Contractor and relayed that the work on the house had not, in fact, been finished as he had so wrongfully assumed on the day he drove away without my having had a chance to say goodbye. So maybe that was the rush.

He responded, "I didn't know you wanted heat in that bedroom."

I said, "Funny, even if I hadn't discussed this matter with you--which I did at length-- why would you EVER assume that I would not want heat in my son's bedroom!!??"

So I stand corrected, we did not have heat. Because what is a source without a mechanism for ignition or a vehicle for delivery?

The Contractor climbed through the narrow attic access door and installed a vent on the same day that his electrician best-friend installed two thermostats, because this time I had had it and I yelled into the phone like I meant it.

Heat is a Bare Essential.

After a short reprieve of easy breezes that led residents back to the shore in late October, the Nor'easter have gained tangible strength. Somehow, the ominous weather seems fitting for Halloween in New England. Both the unsettling holiday and the eerie weather feel authentic to the region, like witch hangings and old houses with tiny rooms. And hearths.

And though the gas flame may not crackle and smell like pine and smoke and the fireplace box has yet to be enclosed by a stylish surround, it has a flame, and the radiant heat, available at the turn of a dial, is the only thing standing between me and my complete unraveling in this house with one million unfinished corners.

That and a glass of red wine.

17 September 2010

The Last Week: Going from a Site to a House. Chapter 2: Going from a House to Home!


Finished Floors

We are finally in the home stretch of that elusively aimed for fifty percent mark. Otherwise know as the we can move in mark, the we can start calling the site a house mark, the we can stop dealing contractors and subcontractors and unrealistic deadlines and bank managers and inspectors mark.

Well, almost. We do still have to pass final building and zoning inspections, have one last consultant inspection for the final draw, and somehow, during that time, convince the contractor to finish the last few details like the missing window in the half-bath and the missing gutters and the missing fire box enclosure.

And a few other details of unfinished contractor business.

To say that it all came to head the night before last would be to deny that there have been enumerable ugly heads.

But two nights ago the cumulative side effects of the renovation delays, small mistakes, changes to the original contract bid, unrealistic expectations of what two can accomplish in a limited amount of time and flat-out exhaustion caught up with us in the form of a house not-quite-ready for the plumbers but no time left to delay them.

That and the hotel - a life-saver in a time like this - was threatening to discontinue our stay for the friends and family rate, making it impossible to afford.

Oh, and Mr.Cool had an interview.

Luckily, the rollmaster, who graduated to superhero, showed up to help get the dented range exchanged for a new one and to pick up the dishwasher in his heromobile which incidentally is a minivan big enough to fit appliances. He also brought cupcakes made by his superhero wife because Superheros always seem to know what mortals need in times of extreme stress. And as it turns out cupcakes taste great with a Corona but then again, what doesn't?

Still. At some point I had to get the kids back to the hotel to do homework and to get them to bed by a reasonable hour which lately has neared 11pm which is late when everyone is up by 7am to get the negotiator to school on time.

Although the negotiator and I managed to put together a few of the kitchen cabinets and the bathroom vanity, the tile was not finished in the bathroom, the kitchen sink was not installed and the fireplace venting system had not arrived in the overnight mail when expected.

Mr.Cool skipped out of work because he is not a teacher and can do that occasionally, slept four hours, and returned to the house to finish setting up the kitchen and installing the tile.

I knew that the plumbers were meant to arrive at the butt crack of dawn (not my words) so when I arrived to the house, in my work clothes, after dropping the older one at school, I expected everyone to be whistling and working together on the common goal of the install and hook-up of all plumbing fixtures.

What was actually happening: the plumbers threw a fit about the "state of things" as the place was not as far along as they had hoped it would be by the time they arrived. They informed Mr.Cool that they were only going to move a couple of things around but not do much because it just "wasn't there yet."

When Mr.Cool - tired and defeated, grouting since four in the morning and worrying about the interview - informed me of this proclamation quietly in the upstairs bathroom out of ear shot from the plumbers. I responded, "Well! that is just unacceptable" and directed the instigator into the "arcade", closed the door and marched my heels down the steep stairs, emphasising the banging sound of the heel digging into the unfinished treads. Many words of anger flew out of my mouth, escalating in pitch and tempo, until the expletives started flowing freely, interjected here and there for emphasis.

I blamed the contractor for his part, the lack of communication between parties, the magnitude of the work to be completed by Mr.Cool and I, on our own, on the top of our full-time jobs and I finished with, "I DO NOT WANT TO LIVE IN A FUCKING HOTEL ANOTHER WEEK!"

The confrontation ice being broken, Mr.Cool chimed in. And at that point, the instigator came down stairs and started crying about his orange juice. So they folded.

I told Mr.Cool he had forty-five minuted to go buy the toilets and I marched myself back upstairs to sponge down the grouted tile, dress pants, heels, and all.

I was late dropping the instigator off at school and late giving a quiz to a class that I had told them to be ON TIME for. I had grout on my pants. But a house without a toilet is just a site. And according to Maslow's hierarchy of needs, it is impossible achieve love and belonging, self-esteem, and self-actualization without first meeting the basic human need for safety and order. How can one feel safe against uncertainty without a home, in whatever form it takes?

The plumbers, either out guilt or kindness or fear or an equal combination of all three, worked all day and into the evening to complete the work. They called the contractor a dumbass to which he responded "I hate this job" for the millionth time and probably bought an expensive scratch ticket after peeling out with his truck, wagon full of tools in tow.

And as far as American Movie Happy Endings go, this story may not qualify.

In the unsettled, raw state of mixed emotions and exhaustion, confusion and chaos, I did not have a chance to thank the contractor for the work that he did contribute to this process for a price that most would have charged to remodel one piece of this disaster-now-house. Not that he did so intentionally. I found out, not long ago, from Willy the sheet rock guy that this was the contractor's first time not just doing the windows and siding, which explains a lot. This was his first full remodel and he had no idea what he was in for until it was too late to back out. I know that I should have been angry at his gross omission of information in the early stages of the process but, strangely enough, I didn't really care.

We all have to start somewhere, right? I myself have a bit of a throw myself into the deep water and learn how to swim later approach to life, so how can I blame someone else for getting in over their head?

So I guess this story has more of a Foreign Film Happy Ending. Bittersweet and abrupt. A bit unsettling but with a satisfactory outcome for the protagonist. An ending that highlights the universal struggle for understanding, forgiveness, and acceptance of human limitations over forces beyond our control.  Unfathomable fortitude against all odds. Laughter when it is least expected. And gratitude for the simplest pleasures.

Like the sound of a flushing toilet.




The Instigator testing the kitchen sink

This is the beginning of the kitchen. Everything we need to get started except a fridge which would not fit through either door by half an inch. So a cooler will have to suffice for now or we may buy a mini fridge for the time being.




Readying the diverter for tile


New full bath fixtures and tile

The upstairs bathroom after the instigator "tested it" (not pictured) note: my boys never put the seat back down.





Looking up while on the stairs at the bottom of the pendant. This is the one that for a time could only be lit by plugging in a vacuum cleaner and switching it on. Fixed now. The large wall is also a greenish/yellow.





Refinishing the floors barefoot, tired, but smiling. I love refinishing old wood floors. It is very gratifying when you get that last coat of polyurethane down and they just sing in all of their unveiled, old timey glory. In the last house, I played on the floor after the last coat had hardened and talked to them like a person whispering sweet nothings like, "I love your blond and auburn streaks." I know, I know I already see a therapist.





Mr. Cool's favorite place. High up. Not really. He is afraid of heights but was the only person that could reach the top of the stair wall to tape and paint.





View of kitchen from climbing stairs.



Instigator checking out the gas range. I showed him how to turn it on out of excitement and then wished I could have a take-back.  I am so excited to cook again! I have never eaten so many carbohydrates and so little vegetables in my life. I bought a new cooking magazine in preparation. A butcher block island is going under the red pendant light.



The instigator's room. Theae are the attic floors. We cleaned them, filled the cracks with paintable caulk (to the best of our ability) primed, and painted a blue border. The room is Orchard Pear by Benjamin Moore and Silver Grey in the window nook. I still need to paint the trim and install base trim.


We are also going to install some protective wood bars over the window that the instigator is looking out of. At least at the bottom to keep him from falling out.


The Negotiator's bedroom. Currently too toxic to inhabit. I painted the floors with an exterior patio enamel and they are off-gassing VOC's something fierce. He will have to stay in the guest room for a while until they air out a bit more. He really wanted shiny white floors and grey walls. This room is going to be awesome when the design is fully realized.




The upstairs office still needs floors done. I am going to tackle these tomorrow.




Although the laundry room has a slop sink, it still needs to be finished as well. Coming soon!




That and everything else on my paper bag to do list.




And one of these days, I would really like to dig my bike back out for a ride to the beach. It has been a while.

The following pictures are from our hotel living days.

 The Negotiator doing his homework in the hallway by the bathroom where I shoved the desk

The Instigator doing his homework on the hood of the car in the Stop and Shop parking lot before school

The Instigator watching cartoons quietly because there is "nothing else to do in this room."



The boys watching TV in the booth at the hotel bar.
Tomorrow, we are checking out of the hotel after almost three weeks of living everyday life like travelers. I am going to miss someone making my bed and straightening up the bathroom vanity but will not miss the complete lack of privacy and eating every meal on a bed.

So, I guess that is it for now.

Stay tuned for the next chapter....coming soon!

How To Make Your Half-Done House into a Stylish Home On A Very Tight Budget.

This should be a piece of cake.



30 August 2010

Day 68: OMG it is almost done.

Red wine in the middle of some boxes


Like I said, it is almost done. That is why I splurged on a 9 dollar bottle of wine.

After work today, I headed over to the house to meet with the Contractor to go over some last minute things like, "are you going to vent the bathroom fan to somewhere besides the attic?" and "are you going to put a window in the half-bath?" and "when will we get the plumbers and electrician back in to install fixtures?' and "do you accept hugs as a tip?"

Alright, not the last one. But now that the once derelict house has been transformed into an almost recognizable home, I am bound to hug someone.  And as much as I love the taping, mudding, and sanding job by Willy, the sheet rock guy, he does not seem like the hugging type.

I asked the Contractor what he is doing next and he said, taking a long vacation. I asked him if our 203K nightmare of a project is why I am always finding scratch tickets in the dumpster out front on Fridays.  He laughed but said, yes.

He said now that it is all Willy from here on out he has nothing to do at the house and might end up reading a book to which I responded coyly, "well, you could tile the bath enclosure, that might keep you from being bored, and since we are so behind schedule...." and he agreed.

I am going to buy the tile first thing in the morning.

Move in date: September 15.

26 August 2010

Days 59-63: Working full-time really interferes with blog writing, as it turns out.

View of the new siding on the front


The only reason I am even catching up on the posts right now is because I am sick and have to eat as many Ricola cough drops and drink as much as much Throat Coat Echinacea tea possible before I have to "get up" and go teach today. The problem is, it is 5:37am which means that by the time my class is starting, I will be ready for a nap. I am just guessing that sleeping while teaching is frowned upon at my University. Besides, only Mr.Cool can sleep sitting up at his desk. I am pretty sure that not even he could sleep standing up in front of a classroom. 

What is happening with The Renovation some of you may wonder (all five of you that read my blog that is) Well, it is moving along, finally. Finally. And as is to be expected, we are running considerably behind schedule. What can I say? Rome was not built in a day.  

The last few days have been a blur of a sped-up Charlie Chaplin film.

I know that at some point I ran out of IKEA crying.

The Instigator misbehaved at Home Depot and cried when he got in trouble.

The Negotiator nearly cried out of guilt for losing track of the Instigator at Home Depot.

Mr. Cool cringed and almost cried because he was so frustrated with the rest of us and mad that this was how he has to spend his only day off from his two jobs.

We have eaten at least four pizzas and eight burritos this week.

The Instigator had a dream that he was eating asparagus and asked for some for dinner.

I have been mostly talking on the phone with the contractor because I am too busy to be at the site now that I am back at work full-time.

On the phone, the Contractor told me that he had to try hard not to bash the Consultant's head into the hood of his truck because he is an asshole.

When I made it to the site, I made Willy, the sheet rock guy, laugh when I told him about my first day back at work.

The Consultant was late to inspect the house by two hours again.

I went to a new student orientation, late, with a wet pants seat and matted down hair held together with Bobbi pins. 

My cell phone died after being rained on all night, through my car window.

I asked Mr.Cool to order me a replacement and when it came in the mail accused him of buying me the clunkiest cell phone on earth because I was in a horrible mood and getting sick.

I listened to six missed messages. Two were from the Consultant.

I ran around like crazy at work.

I wore a short skirt to work and got complimented on my legs.

I climbed under a desk three different times in my short skirt and remembered why I never wear them.

I drove around like crazy.

The sound in may car got worse.

The sound in my car got considerably worse.

We watched Back to the Future and the Instigator hid under the sofa cushions because he could not stand the suspense of Doc running into his own self in the past.

I trained some new faculty members on how to use the projector and where to park.

At work, I moved huge piles of student work from my desk to the floor and then back again.

At home, I moved huge piles of unfolded laundry from my bed to a chair and then back again.

I made up a rap song about moving unfolded laundry back and forth and sang it to the kids who both hated it and threatened to tackle me if I did not stop torturing them.

I got tackled and buried in pillows. 

I packed some boxes and thought about how easy packing was compared to everything else I have to do right now and wished that I could just pack boxes all week.

Mr.Cool went to an interview feeling sick.

Mr.Cool prepped for his class and prepared for an interview for another job while at one of his other two jobs.

At some point we realized that being homeless was a possible outcome of the house renovation being behind schedule and asked Mr.Cool's brother to book us a hotel room. He got us a good deal.

Then we realized that the Instigator had not practiced piano in a week and called the teacher to cancel all classes until we are moved into our new place. He told us that he once lived in a hotel for a month, with a one-year-old.

We realized that we forgot to book a moving truck.

We realized that we were sick of eating burritos and pizza.

We realized that summer was over when the weather got cold.

And yesterday, Mr. Cool and I realized - when we went over to the house after work - that niether of us were quite as excited to see the progress made as we thought we would be when the house finally got to this point because we are both just very burnt-out, tired, and desperate for some return to normality. 



Side View
Leg View

Waiting at the wallpaper store - Photo by Negotiator



Looking very tired at the wallpaper store - Photo by Negotiator
Waiting in massage chairs while we were selecting a range
Home Depot
Running with a lolipop in his mouth at Home Depot - Photo by Negotiator
Half/bath vanity nook with green board

Looking into half'bath with sheet rock
Looking into laundry room with raised floor and sheet rock
Negotiator with lolipop. Self taken.

16 August 2010

Days 47-53: The Witching Week

priming and not talking



Yesterday a friend asked, "you know how it seems like everyday there is one period of about fifteen minutes when everything starts to unravel and everyone needs something from you at the same time?" And I thought, yes, I do know what you mean, if you make that fifteen minutes an eight hour stretch of unwinding with about fifteen minutes of reprieve.

This is how everyday started and ended on days 47-53 of the renovation, building in chaos towards Friday the 13th, with a final blow the day after.

The Witching Week began as normal as a week can begin when you are forced to make a decision about which check to bounce in order to have the funds to purchase a sink and a faucet for the plumbers to install in the full bath.

I realize this does not seem so terrible, but it all went downhill from there.

Day 47

First, was the matter of the mold. This resulted in the removal of all of the floor boards below the stairs [see earlier post] and a portion of the 1/2 bath sub-floor. The Contractor was not pleased that this also involved the careful removal of a framed wall that had already been wired and "while he was it" the reconfiguration of the 1/2 bath vanity location. We offered a 2x6 as a consolation gift but this did not cheer the contractor. He complained a great deal about having to repair the floor and the wall so that the plumbers could rough-in the vanity and toilet.

Next was the matter of the IKEA plumbing fixtures not having cut sheets and the plumbers being concerned about where to locate drain pipes because as they said, "IKEA is European and, you know, not standard like American fixtures."

Then there was the matter of not being able to go purchase just the plumbing fixtures [although I did try] because all the IKEA products need to be purchased at the same time with the check from the bank and we do not have the room to store the kitchen casework and appliances. So nothing was purchased.

And of course there is the matter of how the Instigator feels about IKEA. On this visit [not pictured] he did everything a child could try to do in order for his mother to be permanently banned from all IKEAs world wide. This included jumping from bed to bed, laying in the rug bins with arms tucked in pretending to be a rug, and running full force through every curtain display straight into shoppers on the other side.  To his dismay, the employees did not pay attention. On the upside, the Negotiator and I preselected all of the finishing pieces for his first non-shared bedroom and the kids ate meatballs for free.

I did not know, while I was at IKEA, that the plumbers also needed the gas range specs in order to accurately run the gas line. When they told me this right after I had just returned from IKEA, I angrily informed them that taking one's children to IKEA more than one time per day is for parents that consume speed in addition to their morning coffee.

Then the Contractor informed me that we would have to finish the demo on the bathroom to get it ready for the plumbers the next day so that the Contractor could leave early to get the lumber fix the whole we made in the floor. I agreed out of guilt for the mess we made, but added that at least he did not have to spend an entire weekend hunched under the stairs breathing in mold spores. I am pretty good at guilt-offs. I learned from my Polish Grandma.

Mr.Cool started the demo while I went home and fed the kids dinner. Then we joined him and helped haul the sheet rock to the dumpster before dark.

I reheated the red lentils and rice and Mr.Cool and I settled happily onto the sofa to watch Lie To Me but it had been replaced by Teen Choice Awards for the evening with Katy Perry as host. Not even the negotiator, who is a teen, could stomach watching it.

And I realize that this does not sound all that bad, but it gets worse from here.

Day 48

The next day started with an errand to Home Depot with the Contractor. The plumbers were ready for the bathtub.

The bathtub that I selected for upstairs bathroom is cast iron and cast iron is very heavy. The stairs in our house are also not to code and very narrow and steep. The Contractor lifted the edge and grunted and asked if I could lift an edge. I tried. I could not.

I said, "We can get this lighter, coated steel one, I guess, if you guys can't get this one up the stairs." Knocking on the other tub with my knuckles. Then, swaying girlishly, followed up with. "I mean, I prefer this cast iron one, but you can decide if it is too hard for you for to lift."

The Contractor, an Italian Leo, does not like being told what he can and cannot do. So he said, "Oh, I can get it up the stairs if you want it."

So we bought the heavy tub and some flashing for the roof and a case of water bottles for the guys and drove back to the house.

When the Contractor's Italian but less macho brother saw the tub in the back of the truck, he did not look pleased and said, "This is a heavy fucker, how are we going to get it up the stairs?"

The Contractor responded, "We'll get the plumber to help, he's a big fucker." But then he did not wait for the "big fucker" and in a show of pure Italian manliness carried one half of the tub himself while three other guys managed the other half. But then he forgot that he had sat the stack of flashing down on the entrance stairs, lost his footing and dropped his half of the tub down onto his hip and screamed.

At that moment my heart stopped and I thought, that's it, now I've done it, I've gone and killed the Contractor.

Somehow his brother managed to prevent the full weight of the tub coming down on him so he was injured but not too badly. Then the big plumber ran around the corner and grabbed part of the Contractor's half and got it as far as the stairs. At this point five men were wedged in and around this giant cast iron tub on a thirty inch wide stair with nine inch rises.  I watched, helplessly and feeling incredibly guilty, as they tried to maneuver the beast up the stairs, slamming it into the wall, punching holes in the sheet rock along the way, grunting and cursing. And rightly so. The Contractor was right though. He did get it upstairs.

Then, rubbing his hip, said firmly, "I'm going home now!"

I smiled appreciatively and said, "Thanks! Go home, have some beers, and ice that hip!" I thought about offering him some Arnica but he did not look like he was in the mood to discuss homeopathic remedies.

I guess this is not too bad, when you think about it, I mean, no one went to the hospital, but the week does get worse from here.


Day 49

The next day, I stopped by to see how everything was coming along and the Contractor said that we needed to talk outside, still rubbing his hip. I asked if he was feeling any better and he said a little. Then he laid out paperwork all over the hood of the truck and explained that once again, because plumbing came back higher, and the insulation is costing more than expected to meet the stringent codes of our township, and since it is taking Willy, the sheet rock guy, longer than expected to get the living room taped and mudded, that we are short on money and once again and we have to cut more costs.

Then he rubbed his hip again and I thought about how much Danny Kay managed to get out of Bing Crosby "on the arm" in White Christmas and became concerned that this bathtub mishap might be held against me for a while.

But under the current conditions of holes in floors that needed to be repaired, and the near-death bathtub crushing, and the high plumbing quote, I ceded. So now we have no allotted 203K funds for a refrigerator or a range. I joked bitterly that I guess I did not need a way to preserve or prepare food anyways and could just dry meet in the basement for a while.

So, I accepted that we may not be able to purchase a range for a while but then the plumber said that he needed a cut sheet on a range that does not exist yet so I tried to get a Project Card at Lowes but was not approved in the end. So I called the Contractor and told him that the plumber could just run the gas line to wherever the fuck he wants but that I was not going to be driving around all day trying to figure it out when I have kids at home alone with no snack food watching TV in a dirty house.

And he said he would tell the plumber to just run that part later on, but that I needed to select all of the paint for the entire house by tomorrow morning because he had the meeting with the "paint lady."

So I drove to Benjamin Moore and quickly grabbed about fifty paint swatches to confusion of the employees and drove home and spread them all over the back porch table and and spent a few hours trying to pick the right color palette for every room. I asked the boys what colors they wanted to go in their bedrooms to get them involved with the process and to get them off of the television for a while.

The Negotiator was very agreeable about what might go with his preselected IKEA furnishings but the Instigator simply chose the darkest color of navy blue possible and when I said that it may be a bit too dark for all the walls, he responded, "I want what I want," and went back to watching TV.

Meanwhile, I also figured out that if we do not buy any of the doors for the cabinets and forgo the dishwasher, we may be able to get the range from IKEA. I informed Mr.Cool, so he stopped by IKEA on his way home to get the cut sheet to take to the plumbers. When he gave them the paperwork, the one thing that they needed, the location of the gas hook up location, was not among the fifty pages of information.  Naturally

In the evening, we ate leftovers and watched the results show of So You Think You Can Dance to find out who won this season, but none of us really cared too much because we were still distracted from the chaos of the day.

And while this may not seem all that bad, the chaos increased as the week went on.

Day 50

I prepared an agenda for a meeting at work first thing in the morning. I planned on stopping by the house with the paint samples "on the way" even thought it is back tracking. The Contractor was not there and according to the roofer would not be at the site until 12 or so. Angry, I backtracked to work.

The meeting was stressful but necessary.

Then I picked up the Instigator and flew back to the job site to deliver the paint chips to The Contractor knowing that I had set a coffee date for 12:30 and did not want to be late as I have been, as of late, neglecting my friends in the busyness of the renovation and was really looking forward to seeing them. By the time I got home, the Instigator was starving and the Negotiator complaining about the lack of convenient snack foods in the house. I needed to call a potential adjunct candidate and did so in the car on the way to meet my friend for coffee with my child whining loudly in the backseat, running 45 minutes late at this point.

Simultaneously, I found out that the consultant is out of town and cannot do an inspection of the work on the house when the contractor was expecting him to. So by the time, I arrive at the coffee shop, I am almost an hour late, on the phone while trying to text, looking for a pen, and in possession of no funds to get my crying child lunch because the place does not accept checks. My generous friend bought my son lunch.

I am surprised that I even have friends. Especially considering that I all I talk about is how frustrated I am with my home renovation every time we get together. I should be paying them to spend time with me.

That night we found out that Mr. Cool's Grandmother who was originally given 6 to 12 months was likely not going to make it through the weekend.

And then it got even worse.

Day 51: Friday the 13th

I awoke at 5 in the morning and decided to spend the only quiet time in the house answering work emails and prepping for the looming fall semester.

By 9 the Contractor called and informed me that he is about to quit working on the house because the consultant is in Cape Cod and cannot do the inspection in a timely manner.

The Contractor also did not buy the paint and brought only the three gallons he received gratis from the paint lady back to the house.

He said that he had left the consultant several messages that had not been returned. He went on... that I could just tell him that you will end up being homeless with your children because he was not going to continue to work on the house without being paid something in the immediate, he said.

To appease him, I suggested that maybe I should try to reach the vacationing consultant and told him that I would do what I could do but also needed to get to work to interview someone.

I called the consultant who directed me to the bank. So I called the bank manager with the eastern accent and tried to negotiate releasing some funds without the consultant's sign-off. Pleading. He sort of agreed, from what I could tell, but then I had to run back to the house after getting ready for work to grab a bunch of invoices from the contractor to scan and send back to the bank manager. I assured the contractor that I would do what I can but that I was not going to drive to Boston and hold a gun to his head and so could not guarantee anything.

Half way through scanning the documents and exactly 10 minutes until I needed to leave for work, the scanner stopped working. I took pictures of the last few invoices and wrote what I considered to be a persuasive email then accidentally closed out if without sending it. I wrote it again. I attached everything again. I called the bank manager to make my case over the phone for good measure. I sent the email and ran out to my car. I called my colleague on the way, running almost late, and he said that the candidate had already arrived and was wandering through the hallways. I said "shit, she's early." Got onto to 95 and landed in a heap of slow-moving traffic. This time I said "SHIT" very loudly followed by a few other expletives.

On the way, I called the consultant and left a message explaining the situation. Then I called the Contractor. At this point Very Angry and running late, I yelled into the phone over the traffic, "Listen,______I am running late for work because I had to spend all morning dealing with this shit. Even if the bank manager does not release the funds immediately, you have to get us through the building inspection on Tuesday. You can't just leave us hanging like this."

When the meeting was over, I rushed back home hoping for a short reprieve before needing to go prime the living room and office.

When Mr.Cool returned home he was distraught and informed me that his Grandma would likely not make it through the night and that he had not had the chance to say goodbye. We all wrote emails to have read to her in the hospital and spent some time crying.

By the time we got to the house, we were exhausted, emotionally drained, and realized that we had not eaten dinner and noticed that the light was fading.

We got some cheap greasy pizza instead and tried to watch a funny movie to cheer up a bit. Mr.Cool fell asleep immediately, the Negotiator watched the entire movie, and I distracted myself doing research on how to paint old floor boards.

Even though I had been up since 5 in the morning, I stayed up till 1 because I am not a good sleeper.

Day 52: The final blow

Saturday was actually quite an improvement from Friday, as it usually tends to be. We spent some time with friends in the morning and had a few drinks before it was appropriate an hour to do so.

We primed in the afternoon and the combination of Mr.Cool trying to quit smoking and my poor sleep made for a miserable time with too much arguing and not enough agreeing about how to accomplish the work in time.

A drive-in that serves burgers and milkshakes and takes cards saved the day. So did the Negotiator's help and upbeat attitude. 

I left to get the Instigator who had spent the evening with our friends while Mr.Cool finished up. Then his grandma passed away and he decided to walk back along the beach instead of getting a ride home.

Day 53: Today for 12 more minutes

When Mr.Cool returned from work this afternoon, I had a melt-down because no matter how hard I try to pretend that what we have gotten ourselves into is doable, it is actually nearly impossible. When multiple objects collide at high speeds an explosion happens. And that is that, I said, and went back to bed while the boys went swimming at the Y.  I slept for what felt like an eternity. Long enough to have a dream within a dream.

In the inner dream the Contractor was Polish and complaining about the money he was spending on the downstairs bathroom and I was frustrated with him. But when I went downstairs I realized that the bathroom was a water park feature complete with a man-made waterfall, soaking tubs, and a slide. The kids were playing on it joyfully. Then I woke from this inner dream to tell Mr.Cool about it and how unrealistic it was and he said but wouldn't it be nice to have those soaking tubs in the fall when it starts to get a little cool? Then I really woke up and told Mr.Cool and he laughed.

But now that I think about it, it is a dream come true, just wrapped in a very difficult-to-open package.




 
















30 July 2010

Day: 36 U R the best

Dormer and 3 kitchen windows installed
I am very pleased to report that we have the new windows and most of them are installed.

Living room windows installed
And the house is starting to look--dare I say it-- cute and bright.

Eave casement window in bedroom installed
It is amazing what a few installed vinyl windows will do for a person's spirit....

 Vegetarian Pizza and a Sam Adams
 ...as well as finding a good brick oven pizza joint that also serves beer that is not very far from where you are about move.

Adding to that bit of heaven, is the fact that the negotiator is back in town, and now a solid two inches taller than me, by our back-to-back measure.

The Contractor was not angry about the mess with the moldy sheet rock and insulation strewn all over the kitchen floor or Mr. Cool's letter with the exclamation points and underlines. He agreed to replace all of the damaged and moldy goods. And when I texted him that we will, in fact, be getting the full amount for the second draw --what we were hoping for-- as a result of my numerous dealings with the foreign and forgetful bank manager, the contractor replied in text:

U R the best.

So maybe we are becoming friends now.

28 July 2010

Day 34: I am NOT Phyllis

This is Phyllis
 
What do you get when The Contractor has food poisoning, the 203K Consultant is hard of hearing, and the Bank Manager suffers from case-by-case amnesia?

Nothing.

Literally. Although it makes for some funny material.

So, as it turns out, The Contractor did not choose to discontinue work on the house late last week and into Monday as I had previously [wrongly] assumed but has instead taken very ill with food poisoning. Likely, from a meal he ate while on the job at my house, purchased from a convenience store up the road.  Hopefully it was not an egg sandwich.

When I called The Contractor to find out if he would be by today [and found out that he had not had a solid meal in four days] I also noticed that I had missed a call from the Consultant. So I told The Contractor to go back to bed and not to worry about Anything until tomorrow when the windows come in. Then I called the Consultant. 

The Consultant answered the phone call in this way:

[clearly in his car, he yelled over some loud noises] Phyllis? Phyllis?
Me: No. It's______."
C: Listen, Phyllis, I am running late, I had a family emergency. Do you want to just wait there?
Me: I am not Phyllis.
C: Listen, Phyllis we don't have to do this today. We can reschedule or do you want to just wait for me?
Me: I am NOT Phyllis! Can you hear me?
C: [clearly confused] Oh...then, who is this?
Me: This is ______.
C: Who?
Me: My name is ______________My address is __________________.You left ME a message. Why do I need to call you about this draw? What is the problem?
C: Ohhhh, riiiight. Well the issue is.....and so on and so on you should probably call the bank about that problem.

So, as always, the vagaries of the conversation with nearly-deaf consultant prompt phone call to bank manager with case-by-case amnesia and thick Middle Eastern accent.

Me: Hi, it's ________(aka: not Phyllis).
Bank: [a bit nervous] Listen, I did not forget, as I say before, I am swamped.
Me: That's fine. I just had a quick question if I could....
Bank: I did NOT forget.  [shuffling papers]
Me: Uh, OK. So, when did the check go out?
Bank: I will overnight. Yes, I will overnight today...or tomorrow.
Me: So, it hasn't gone out?
Bank: I did not forget to.
Me: Well, do you know how much it will be for? Approximately?
Bank: No.
Me: But I'll get it tomorrow or the day after?
Bank: Yes.


And I am just left wondering who this Phyllis person is and whether or not I will get the check to pay the contractor so that he can buy some better quality convenience store food.

21 July 2010

Day 27: Progress is a knee wall

View into the new loft area and doorway to bedroom

Sometimes it's the small things.

A framed in closet and a knee wall. An electrician who can read construction documents and follows instructions. The onetime unneighborly-neighbor inviting your sweaty bored child to play in his pool. Like I said, the small things.

I am not sure who finally talked some sense into The-Very-Stubborn-Contractor but he returned to the job today without any of the usual pomp or unreasonableness, seeming to have attended a behavioral modification therapy session on centering and acceptance. I do not think that I can take credit for this sudden change of attitude although pouting and returning all of his comments with curt remarks and then ignoring him may have finally gotten through to him more than the reasoning and logically explaining. Or maybe he has a very reasonable wife or girlfriend that told him to suck it up and finish the work so that he brings home the bacon. Whatever the reason, he not only made a concerted effort to finish some interior framing but he also assured me that everything will get done, on schedule even.

We'll see about that.

19 July 2010

Day 26: Bravo TV and sweet seven year olds are great when you're feeling down.

Nothing is more frustrating than conversations that reach no resolution.

This is what occurred at the house this morning during a huge hurricane-style coastal storm. The Contractor and I were leaning out of the dormer window frames assessing the amount of water flowing into the room while I was trying to explain once again to this man -- who apparently understands nothing about government related processes and red tape --that if we do not work within the existing contract, we will get nowhere with the bank. After a good 1/2 hour of shouting over the noise of the storm, I delusionally thought that we had reached some common understanding. And as I decided that it would be very nice to call it a day at the rained in mess of a deconstructed house and leave the contractor and his brother to the dump runs, The Contractor pulls a scribbled on piece of paper out of his beat up briefcase and points to some numbers that DO NOT MATCH what is on the escrow release form [that he and I both signed before I closed on the house] and says, "I know my paper work is not fancy like yours but when Don comes on Wednesday, I am expecting him to sign off on this number."

And in my head I am thinking WTF@!!!!**!!! but what I say, after taking a deep pranayama breath, as patiently as possible, is, "See, ____we can't get that amount released because it is not on the form, like we just talked about." In my head [Are you a complete idiot or do you just not listen???] Followed by another 1/2 hour conversation that gets nowhere. After I drive home but before I eat breakfast, I have another pointless conversation on the phone with the consultant that provides no valuable information, which is followed closely by a conversation with the bank manager that gets nowhere.

At that point I make The instigator and I some eggs and toast. Tell him that he can do whatever he wants and plop down despondent in front of the TV and what should happen to be on Bravo but?

Flipping Out.

And the show is somehow more poignant than before because now I finally understand why he is always flipping out.

Then the little Instigator brings me this heartfelt, thoughtful paintbrush drawing [posted at top] gives me a hug and explains that it is a drawing of him skiing hearts in the snow for me and tells me that he has also saved it as "cheer up mom" so in case I ever need to look at it when I'm down, it will always be there in My Documents.

And that's it. It's just tears after that, because what else is there to do?

16 July 2010

Day 23: Nothing like a refreshing swim at the Y





the title pretty much says it all.

it is finally the weekend. the work must stop. for one thing, i need to do my dishes.

in the 100% humidity of the late afternoon with the 100 degree weather and the jellyfish in the sea, the Y pool seemed like the safest bet for a family cool-down. we made it 1/2 hour before it closed. the woman at the front counter said-asked "you realize that the pool is closing in 30 minutes" as we ran past her, Instigator already in his swim trunks. we swam as many laps as possible. The Instigator was the last person out of the pool. he decided to swim across to get to his towel instead of walking around the edge. the lifeguard tried not to look annoyed.

the house and the communication between contractor and consultant, the bank manager and consultant, the contractor and the sub contractor, the contractor threatening to drive to Boston to "communicate" physically with the bank manager in the parking lot, me in the middle of all these men who can't communicate. the money, the money, the money.

it can all wait until monday.

14 July 2010

Day 21: Don't bring around the clouds to rain on my parade....


According to the old adage, anytime something seems too good to be true...it generally is. That theory certainly holds true when combining the flavors of chocolate and jalapenos and unseasonably warm oceans (the jellyfish) and home renovation estimates.

As it turns out.

After an elating, if not slightly dangerous, visit to the house last night with Mr. Cool and little Instigator (who tried to fall down an open stair into loose electrical wires) I returned home full of pep and smiles - despite the 4 hours of sleep the night before - to tackle the lighting plan.

The Contractor called and asked, in quick succession, "do you have a minute?" and "do you have a pad and paper?" and "are you sitting down?" My heart rate increased about 10rpm's per question as I answered. yes. yes. Yes?

His response [he inhales one long breath] and in one long train-of-thought sentence:

"So listen, I have never done a HUD job before and I can't look at the numbers the way you are so I'm just going to tell you what everything is actually costing and you can just go ahead and throw out the first estimates because it's a lot more than we thought because the plumbing is coming back high and the furnace ducting all needs to be replaced and you keep asking me to change more sill heights...so if you subtract this number after windows and siding and the dormer and the labor from this last bit that we have...i'm not even making a profit on this job and we don't have the funds to finish it at the rate that we're going and that's without any of the plumbing fixtures or flooring or....."

Me: hunching over in my chair, scribbling giant spirals that look like black holes [incredulously]
"what are you saying?"

The Contractor: "I don't know. We don't have enough money to do this. What we're talking about is 120,000 dollar job and we're trying to do it for 50,000." Can you get more funds?

Me: [still incredulous] No! I'm not a plumber, I'm a teacher.

The Contractor: Well, I feel like we have a good relationship and we just need to keep the lines of communication open. And I like you, but I'm not doing this for free. We need to figure out how not to replace that furnace and how to make some compromises. I mean, you keep telling me that you don't want to compromise on the kitchen, but what about the bathroom upstairs?

Me: [hunching lower, spirals growing larger, resigned] "OK. I'll take a look at the floor plan tonight and see if i can't cut some costs. We'll talk to the inspector about the furnace."

The Contractor: [somewhat sincerely] "Sorry about this. I won't walk out and leave you hanging but we've got to make it work."

Me: I bet.

Click.

So, as the evening turned into night, Mr. Cool and I sat and discussed, weighed options and argued, and every other minute, simultaneously sighed heavily.

[in the kitchen]

"If only he had been up front from the beginning."

"I know. It's harder now because we thought he could do all this within the budget."

sigh. sigh.

[in the living room]

"I would never have taken it this far, if I didn't think it was feasible."

"I had a feeling his numbers were off."

sigh. sigh.

[back at the computer]

"That's what we get for trusting this guy."

"Do you think he's being malicious or is he just inexperienced?"

sigh. sigh.

[back in the kitchen]

"we have to make some compromises about the bathroom. what if__"

"No! i'm so pissed right now. i'd rather reconfigure the bathroom and put a closet in the shower spot than let him have his way."

sigh. sigh.

[back in the living room, late, Mr. Cool starting to fade]

"did we make a mistake?"

"i don't want to think about that right now. we have to go on."

sigh. sigh.

[Mr. Cool deliriously tired]

"we could tell The Contractor to use a space heater near the gas furnace and just see what happens" [laughing]

"yeah right. you always hear about those people and think, 'how desperate.' they always get caught."

sigh. sigh.

"i'm going to bed. will you be able to sleep?"

"not likely."

so as Mr. Cool slept, I sat back down at the computer from 12 to 2 and came up with ways to cut some costs for both labor and materials to discuss with The Contractor in the morning. Then I slept for a few hours.

After the meeting today we are feeling once again like it just might be possible to get this placed finished enough (roughly but correctly) --without the 2nd floor bath expansion-- by The Contractor and his crew + the subs so that Mr. Cool and I can get in there and do the last phase ourselves. After all, we do like to get our hands dirty.

At the end of the day, I've accepted that this process was something like wanting a dog really bad, but then being promised a pony, you start to want only the pony. When the option of the pony is taken away, so that you're left with the dog you originally wanted, you feel somehow like the dog is less than what you really wanted in some way. But then you realize that a dog is better than no pet at all. And at least a dog is not a gerbil.

And I'm not settling for no stinkin' gerbil of a house!