| Finished Floors |
We are finally in the home stretch of that elusively aimed for fifty percent mark. Otherwise know as the we can move in mark, the we can start calling the site a house mark, the we can stop dealing contractors and subcontractors and unrealistic deadlines and bank managers and inspectors mark.
Well, almost. We do still have to pass final building and zoning inspections, have one last consultant inspection for the final draw, and somehow, during that time, convince the contractor to finish the last few details like the missing window in the half-bath and the missing gutters and the missing fire box enclosure.
And a few other details of unfinished contractor business.
To say that it all came to head the night before last would be to deny that there have been enumerable ugly heads.
But two nights ago the cumulative side effects of the renovation delays, small mistakes, changes to the original contract bid, unrealistic expectations of what two can accomplish in a limited amount of time and flat-out exhaustion caught up with us in the form of a house not-quite-ready for the plumbers but no time left to delay them.
That and the hotel - a life-saver in a time like this - was threatening to discontinue our stay for the friends and family rate, making it impossible to afford.
Oh, and Mr.Cool had an interview.
Luckily, the rollmaster, who graduated to superhero, showed up to help get the dented range exchanged for a new one and to pick up the dishwasher in his heromobile which incidentally is a minivan big enough to fit appliances. He also brought cupcakes made by his superhero wife because Superheros always seem to know what mortals need in times of extreme stress. And as it turns out cupcakes taste great with a Corona but then again, what doesn't?
Still. At some point I had to get the kids back to the hotel to do homework and to get them to bed by a reasonable hour which lately has neared 11pm which is late when everyone is up by 7am to get the negotiator to school on time.
Although the negotiator and I managed to put together a few of the kitchen cabinets and the bathroom vanity, the tile was not finished in the bathroom, the kitchen sink was not installed and the fireplace venting system had not arrived in the overnight mail when expected.
Mr.Cool skipped out of work because he is not a teacher and can do that occasionally, slept four hours, and returned to the house to finish setting up the kitchen and installing the tile.
I knew that the plumbers were meant to arrive at the butt crack of dawn (not my words) so when I arrived to the house, in my work clothes, after dropping the older one at school, I expected everyone to be whistling and working together on the common goal of the install and hook-up of all plumbing fixtures.
What was actually happening: the plumbers threw a fit about the "state of things" as the place was not as far along as they had hoped it would be by the time they arrived. They informed Mr.Cool that they were only going to move a couple of things around but not do much because it just "wasn't there yet."
When Mr.Cool - tired and defeated, grouting since four in the morning and worrying about the interview - informed me of this proclamation quietly in the upstairs bathroom out of ear shot from the plumbers. I responded, "Well! that is just unacceptable" and directed the instigator into the "arcade", closed the door and marched my heels down the steep stairs, emphasising the banging sound of the heel digging into the unfinished treads. Many words of anger flew out of my mouth, escalating in pitch and tempo, until the expletives started flowing freely, interjected here and there for emphasis.
I blamed the contractor for his part, the lack of communication between parties, the magnitude of the work to be completed by Mr.Cool and I, on our own, on the top of our full-time jobs and I finished with, "I DO NOT WANT TO LIVE IN A FUCKING HOTEL ANOTHER WEEK!"
The confrontation ice being broken, Mr.Cool chimed in. And at that point, the instigator came down stairs and started crying about his orange juice. So they folded.
I told Mr.Cool he had forty-five minuted to go buy the toilets and I marched myself back upstairs to sponge down the grouted tile, dress pants, heels, and all.
I was late dropping the instigator off at school and late giving a quiz to a class that I had told them to be ON TIME for. I had grout on my pants. But a house without a toilet is just a site. And according to Maslow's hierarchy of needs, it is impossible achieve love and belonging, self-esteem, and self-actualization without first meeting the basic human need for safety and order. How can one feel safe against uncertainty without a home, in whatever form it takes?
The plumbers, either out guilt or kindness or fear or an equal combination of all three, worked all day and into the evening to complete the work. They called the contractor a dumbass to which he responded "I hate this job" for the millionth time and probably bought an expensive scratch ticket after peeling out with his truck, wagon full of tools in tow.
And as far as American Movie Happy Endings go, this story may not qualify.
In the unsettled, raw state of mixed emotions and exhaustion, confusion and chaos, I did not have a chance to thank the contractor for the work that he did contribute to this process for a price that most would have charged to remodel one piece of this disaster-now-house. Not that he did so intentionally. I found out, not long ago, from Willy the sheet rock guy that this was the contractor's first time not just doing the windows and siding, which explains a lot. This was his first full remodel and he had no idea what he was in for until it was too late to back out. I know that I should have been angry at his gross omission of information in the early stages of the process but, strangely enough, I didn't really care.
We all have to start somewhere, right? I myself have a bit of a throw myself into the deep water and learn how to swim later approach to life, so how can I blame someone else for getting in over their head?
So I guess this story has more of a Foreign Film Happy Ending. Bittersweet and abrupt. A bit unsettling but with a satisfactory outcome for the protagonist. An ending that highlights the universal struggle for understanding, forgiveness, and acceptance of human limitations over forces beyond our control. Unfathomable fortitude against all odds. Laughter when it is least expected. And gratitude for the simplest pleasures.
Like the sound of a flushing toilet.
| The Instigator testing the kitchen sink |
This is the beginning of the kitchen. Everything we need to get started except a fridge which would not fit through either door by half an inch. So a cooler will have to suffice for now or we may buy a mini fridge for the time being.
| Readying the diverter for tile |
| New full bath fixtures and tile |
The upstairs bathroom after the instigator "tested it" (not pictured) note: my boys never put the seat back down.
Looking up while on the stairs at the bottom of the pendant. This is the one that for a time could only be lit by plugging in a vacuum cleaner and switching it on. Fixed now. The large wall is also a greenish/yellow.
Refinishing the floors barefoot, tired, but smiling. I love refinishing old wood floors. It is very gratifying when you get that last coat of polyurethane down and they just sing in all of their unveiled, old timey glory. In the last house, I played on the floor after the last coat had hardened and talked to them like a person whispering sweet nothings like, "I love your blond and auburn streaks." I know, I know I already see a therapist.
Mr. Cool's favorite place. High up. Not really. He is afraid of heights but was the only person that could reach the top of the stair wall to tape and paint.
View of kitchen from climbing stairs.
Instigator checking out the gas range. I showed him how to turn it on out of excitement and then wished I could have a take-back. I am so excited to cook again! I have never eaten so many carbohydrates and so little vegetables in my life. I bought a new cooking magazine in preparation. A butcher block island is going under the red pendant light.
The instigator's room. Theae are the attic floors. We cleaned them, filled the cracks with paintable caulk (to the best of our ability) primed, and painted a blue border. The room is Orchard Pear by Benjamin Moore and Silver Grey in the window nook. I still need to paint the trim and install base trim.
We are also going to install some protective wood bars over the window that the instigator is looking out of. At least at the bottom to keep him from falling out.
The Negotiator's bedroom. Currently too toxic to inhabit. I painted the floors with an exterior patio enamel and they are off-gassing VOC's something fierce. He will have to stay in the guest room for a while until they air out a bit more. He really wanted shiny white floors and grey walls. This room is going to be awesome when the design is fully realized.
The upstairs office still needs floors done. I am going to tackle these tomorrow.
Although the laundry room has a slop sink, it still needs to be finished as well. Coming soon!
That and everything else on my paper bag to do list.
And one of these days, I would really like to dig my bike back out for a ride to the beach. It has been a while.
The following pictures are from our hotel living days.
| The Negotiator doing his homework in the hallway by the bathroom where I shoved the desk |
| The Instigator doing his homework on the hood of the car in the Stop and Shop parking lot before school |
| The Instigator watching cartoons quietly because there is "nothing else to do in this room." |
| The boys watching TV in the booth at the hotel bar. |
Tomorrow, we are checking out of the hotel after almost three weeks of living everyday life like travelers. I am going to miss someone making my bed and straightening up the bathroom vanity but will not miss the complete lack of privacy and eating every meal on a bed.
So, I guess that is it for now.
Stay tuned for the next chapter....coming soon!
How To Make Your Half-Done House into a Stylish Home On A Very Tight Budget.
This should be a piece of cake.

